Symphony I/O Second Module Installation

Symphony I/O Second Module Installation

In this tutorial we will show you how easy it is to install a second Module into Symphony I/O, giving you great flexibility for just about any I/O configuration.

Use a Phillips screwdriver to remove the 11 screws holding the cover on.

If you have installed the rack ears, you will need to remove those as well.

Slide the cover off, The front lip may catch as you are sliding the cover off, pull gently on the sides, of the cover, and then pull back and up slightly.

Remove the 2 screws holding the center support in place, and  remove it .

Remove the blank panel that is in the second slot. Make sure to save these 2 screws as you will need them to secure the new I/O module later.

9 screws hold in the I/O module that has already been installed.

One by one, replace the 9 screws with the provided aluminum stand offs.

Place the I/O module and align it so that you can re-install the 9 screws you just removed.

Don’t tighten them all the way at this time.

Install the two screws on the back panel that you removed earlier.

Now tighten the 9 screws

Connect the provided ribbon cable to the Secondary I/O port on the Main board… and the other end of the ribbon cable to the new I/O Module.

Reconnect the center support bar.

Slide the cover back into place and secure with the 11 screws you removed earlier. The 6 screws on the bottom are flat and should mount flush. The 5 on the back have rounded heads and will not be flush .

Your new I/O module is now installed and ready to use.

Leave a Reply

You must be logged in to post a comment.